Skip over navigation
« Previous Next »

Remarkables Ski Field Base Building

Curvy Basin and Remarkables Ski Field Base Building

PeterFell was proud to work with Allied Concrete on the Remarkables Ski Field Base Building Project.

An impressive 2400m3 concrete was for the new Base Building (1600m above sea level) at the Remarkables Ski Field. Over 150m3 was coloured concrete for the decks.

Arrow International (NZ) Ltd

Head Contractor

Michael Wyatt Architects (MWA)

Architect

Aurecon

Structural Consultant

Cosgroves

Electrical, Mechanical and Fire Consultants

PeterFell

Colour

Latest News & Case Studies

News

Bay House

Bay House by SGA Architects and Bonham Builders The Bay House has...

News

Tara Iti Clubhouse

Tara Iti Clubhouse - A Hospitality award winner at the 2018...

Case Study

Remarkables Ski Field Base Building

Curvy Basin and Remarkables Ski Field Base Building PeterFell was...

Case Study

Alp, Akabane Tokyo, Japan

IN HARMONY WITH NATURE PeterFell New Zealand's only distributor of...

Case Study

Mission Bay Pavilion

Herbst Architects have teamed up with Katie Lockhart Studio to custom...

Previous Newsletters

Archived Newsletters